Random thermal cracking is among the most costly and aggravating problems facing concrete contractors.
The timing of expansion join cutting is the solution. The SOFF-CUT Ultra Early Entry System is performed during the Green Stage of concrete slab construction in order to: - Minimize the chance of random thermal cracking
Added advantages of this system are: - No water required, therefore no Slurry
- Small dry dust residue remains
- Ready for sub-contractors next day
- Noise level below minimum required
- Depth of cuts from 30mm to 75mm
|
|